PEACH RIDGE RD over BRAZOS RIVER DRAW
1.80 MI S OF IH 10 · County 473, Texas · Built 1946 · 2 Lanes · 170 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
29.754706, -96.012217
This bridge is in worse condition than 91% of bridges in County 473. The average bridge in Texas is 0 years old; this one is 80 years old.
Nearby Bridges
HOUSE RD over BRAZOS RIVER DRAW
Built 1947
IH 10 EB FR over BRAZOS RIVER RELIEF
Built 1967
IH 10 over BRAZOS VALLEY RELIEF
Built 2022
IH 10 ML over BRAZOS RIVER RELIEF
Built 2022
IH 10 over BRAZOS RIVER RELIEF
Built 2020
IH 10 over BRAZOS RIVER RELIEF
Built 2020
IH 10 ML over BRAZOS RIVER RELIEF
Built 2020
IH 10 over BRAZOS RIVER RELIEF
Built 2020
IH 10 ML over BRAZOS RIVER RELIEF
Built 2020
IH 10 ML over BRAZOS RIVER RELIEF
Built 2020
Bridge Details
- Structure #
- 122370AA0102001
- Year Built
- 1946
- Reconstructed
- 1984
- Length
- 15.2 m (49.9 ft)
- Max Span
- 7.3 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 170
- Material
- Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $23,000
- Total Project Cost
- $29,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.