FM 359 over BROOKSHIRE CREEK

1.90 MI S OF IH 10 · County 473, Texas · Built 1988 · 2 Lanes · 4,254 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
122370054301021
Year Built
1988
Length
46 m (150.9 ft)
Max Span
15.2 m
Width
16 m (52.5 ft)
Lanes
2
Daily Traffic
4,254
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.