IH 10 EB over HARDY CREEK

0.7 MI W OF FM 1489 · County 473, Texas · Built 2020 · 2 Lanes · 26,750 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
122370027104727
Year Built
2020
Length
114.3 m (375 ft)
Max Span
24.4 m
Width
20.9 m (68.6 ft)
Lanes
2
Daily Traffic
26,750
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.