US 290 WB over LIENDO PARKWAY

4.8 MI W OF FM 362 · County 473, Texas · Built 1996 · 2 Lanes · 22,529 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
122370011411162
Year Built
1996
Length
97.5 m (319.9 ft)
Max Span
36.6 m
Width
15.5 m (50.9 ft)
Lanes
2
Daily Traffic
22,529
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.