HIGHLAND BLVD over DRY CREEK RELIEF
0.1 MI S OF PARKER RD · County 339, Texas · Built 2003 · 2 Lanes · 100 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 8 | Very Good |
Location
30.200208, -95.627275
This bridge is in worse condition than 37.3% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
HIGHLAND BLVD over DRY CREEK
Built 2003
DEER PATH LN over DRAINAGE DITCH
Built 2000
EDGEWATER DR over WINDCREST LAKE
Built 2000
FM 1488 over OUTFALL 12
Built 2010
FM 2978 over DRY CREEK
Built 1977
CIMARRON CRK BLVD over BEAR BRANCH
Built 2015
FM 1488 over BEAR BRANCH CREEK
Built 2010
HAWKHURST DR over DRAINAGE DITCH
Built 2008
FM 1488 over OUTFALL 1
Built 2010
WOODLANDS PKWY over SPRING CREEK TRIBUTARY
Built 2001
Bridge Details
- Structure #
- 121700AA2091002
- Year Built
- 2003
- Length
- 12.2 m (40 ft)
- Max Span
- 12.2 m
- Width
- 8 m (26.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $14,000
- Total Project Cost
- $18,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.