WINDMILL LANE over DRAW
0.7 MI W OF HONEA EGYPT · County 339, Texas · Built 2013 · 2 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.252461, -95.598339
This bridge is in worse condition than 37.3% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 13 years old.
Nearby Bridges
BOARS HEAD RD over LAKE CREEK TRIBUTARY 2
Built 2009
HONEA EGYPT RD over LAKE CREEK
Built 1991
HONEA EGYPT RD over LAKE CREEK DRAW
Built 1989
S TRACE DR over STOWE BRANCH
Built 1997
Superior Rd over Lake Crk
Built 2021
Fish Crk TRFR SB over Lake Crk
Built 2021
FISH CREEK TRFR NB over LAKE CREEK
Built 2009
FM 1488 over OUTFALL 12
Built 2010
FM 1488 over BEAR BRANCH CREEK
Built 2010
CIMARRON CRK BLVD over BEAR BRANCH
Built 2015
Bridge Details
- Structure #
- 121700AA2090001
- Year Built
- 2013
- Length
- 15.2 m (49.9 ft)
- Max Span
- 14.9 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.