OLD HWY 105 over PEACH CREEK

5.65 MI SE OF FM 105 · County 339, Texas · Built 1989 · 2 Lanes · 150 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
121700AA1988067
Year Built
1989
Length
24.7 m (81 ft)
Max Span
22.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
150
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.