MILLMAC RD over DRAW
0.4 MI NE OF SH 105 · County 339, Texas · Built 1978 · 2 Lanes · 1,240 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 5 | Fair |
Location
30.335917, -95.355767
This bridge is in worse condition than 97.7% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
SH 105 MLs over Hurricane Creek
Built 2024
SH 105 ML over E Fork Crystal Crk
Built 2024
MILLMAC ROAD over CANEY CREEK
Built 2009
MILLMAC RD over CANEY CREEK RELIEF
Built 2009
SH 105 EB&WB over Caney Creek
Built 2024
SH 105 over Cagle Branch Crk
Built 2024
WHIPPORWILL LN over E FORK CRYSTAL CRK
Built 1987
SH 105 over W Frk Crystal Crk Trib 1
Built 2024
SH 105 over FOUR MILE CR
Built 1936
HARVILL DR over W FORK CRYSTAL CREEK
Built 1970
Bridge Details
- Structure #
- 121700AA1952001
- Year Built
- 1978
- Length
- 11 m (36.1 ft)
- Max Span
- 5.5 m
- Width
- 7.4 m (24.3 ft)
- Lanes
- 2
- Daily Traffic
- 1,240
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.