SH 249 SB BR1A-06 over FM 149
1.27 MI NW of FM 1774 · County 339, Texas · Built 2020 · 2 Lanes · 10,700 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
30.183186, -95.6829
This bridge is in worse condition than 32.3% of bridges in County 339. The average bridge in Texas is 0 years old; this one is 6 years old.
Nearby Bridges
SH 249 NB BR1A-05 over FM 149
Built 2020
FM 149 over MILL CREEK
Built 1982
FM 149 over MILL CREEK RELIEF
Built 1982
SH 249 SB over FUTURE TERRA BLVD
Built 2020
SH 249 SB over MILDRED LANE
Built 2020
SH 249 NB BR1A-07 over MILDRED LANE
Built 2020
SH 249 NB over FUTURE TERRA BLVD
Built 2020
FM 1774 over DITCH
Built 2020
FM 1774 over DECKER BRANCH
Built 2020
SH 249 Culvert 10 over MILL CREEK TRIB. NO 1
Built 2020
Bridge Details
- Structure #
- 121700363501006
- Year Built
- 2020
- Length
- 67.4 m (221.1 ft)
- Max Span
- 39 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 10,700
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.