MICHEL RD over HCFCD DITCH
0.2 MI E OF TOMBALL PKWY · County 201, Texas · Built 1995 · 2 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.082392, -95.627447
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 31 years old.
Nearby Bridges
MEDICAL COMPLEX DR over HCFCD DITCH
Built 2000
SH 249 ML Toll over Alice Rd
Built 2015
SH 249 over HCFCD DITCH M125-00-00
Built 2006
Medical Complex Dr over HCFCD Ditch M121-00-00
Built 2016
SH 249 over FM 2920
Built 2007
Theis Lane over HCFCD M121-00-00
Built 2022
HUMBLE RD over HCFCD DITCH
Built 2010
Everpines Trail over HCFCD M121-00-00
Built 2022
SH 249 ML Toll over Holderrieth Rd & BUS 249
Built 2015
SH 249 NBFR over HCFCD DITCH M124-00-00
Built 2007
Bridge Details
- Structure #
- 121020W51086011
- Year Built
- 1995
- Length
- 7.3 m (24 ft)
- Max Span
- 3 m
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.