SAINT LO RD over HCFCD DITCH
0.30 MI SW OF MLK BLVD · County 201, Texas · Built 1960 · 2 Lanes · 1,530 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
29.675153, -95.33915
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 66 years old.
Nearby Bridges
VAN FLEET ST over HCFCD DITCH
Built 1996
JUTLAND RD over HCFCD DITCH
Built 1995
SOUTHBANK ST over HCFCD DITCH
Built 2001
CRESTMONT ST over HCFCD DITCH
Built 1985
IH 610S WB over MLK BLVD
Built 1968
IH 610S EB over MLK BLVD
Built 1968
IH 610S WB over CALAIS RD
Built 1968
IH 610S EB over CALAIS RD
Built 1968
DOULTON RD over HCFCD DITCH
Built 1985
IH 610 WB over CRESTMONT ST
Built 1968
Bridge Details
- Structure #
- 121020B60157037
- Year Built
- 1960
- Reconstructed
- 1998
- Length
- 8.8 m (28.9 ft)
- Max Span
- 4.3 m
- Width
- 15.2 m (49.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,530
- Material
- Wood or Timber
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $17,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.