WEST OREM DR EB over HCFCD DITCH

1.65 MI E OF S POST OAK · County 201, Texas · Built 1963 · 2 Lanes · 6,310 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
121020B49009005
Year Built
1963
Length
20.1 m (65.9 ft)
Max Span
7.3 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
6,310
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.