NAVIGATION BLVD over UPRR TERMINAL N MACK ST
0.10 MI W OF 67TH ST · County 201, Texas · Built 1970 · 4 Lanes · 17,800 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.746592, -95.307928
This bridge is in worse condition than 99.4% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
Harrisburg Blvd. over Hughes Rd & UPRR
Built 2017
US 90A SB over BUFFALO BAYOU/ ZOLTOWSKI
Built 1956
US 90A NB over BUFFALO BAYOU/ ZOLTOWSKI
Built 1956
HUGHES ST over COUNTRY CLUB BAYOU
Built 1929
CLINTON DR over UP RR
Built 1988
US 90A (S WAYSIDE) over COUNTRY CLUB BAYOU
Built 2019
LOCKWOOD DR over BUFFALO BAYOU
Built 1982
POLK ST over COUNTRY CLUB BAYOU
Built 1950
US 90A SB over Clinton Dr. & UP RR
Built 2012
US 90A NB over Clinton Dr. & UP RR
Built 2012
Bridge Details
- Structure #
- 121020B46641550
- Year Built
- 1970
- Length
- 248.7 m (815.9 ft)
- Max Span
- 22.6 m
- Width
- 18.3 m (60 ft)
- Lanes
- 4
- Daily Traffic
- 17,800
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $78,000
- Total Project Cost
- $98,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.