HIRSCH RD NB over UPRR

0.4 MI N OF KELLEY ST · County 201, Texas · Built 2016 · 2 Lanes · 3,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020B32105011
Year Built
2016
Length
172.2 m (565 ft)
Max Span
56.4 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
3,200
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.