HAMMERLY BLVD over HCFCD DITCH
0.01 MI E OF MCKEAN DR · County 201, Texas · Built 1969 · 5 Lanes · 10,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.810767, -95.513825
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 57 years old.
Nearby Bridges
EMNORA LN over HCFCD DITCH
Built 1999
HOLLISTER RD over PROETZELS BRANCH
Built 2017
LACYBERRY ST over DRAINAGE DITCH
Built 2007
Emnora Ln E PO Rd over Drainage Ditch
Built 1980
Emnora Ln W PO Rd over Drainage Ditch
Built 1980
LONG POINT RD over SPRING BRANCH
Built 1962
BLALOCK RD over DRAINAGE DITCH
Built 1980
LONG POINT RD over PROETZELS BRANCH
Built 1962
CAMPBELL RD over HCFCD DITCH
Built 1997
CREEK DR over BUTTERMILK CREEK
Built 1999
Bridge Details
- Structure #
- 121020B29905081
- Year Built
- 1969
- Length
- 23.5 m (77.1 ft)
- Max Span
- 7.6 m
- Width
- 22.6 m (74.1 ft)
- Lanes
- 5
- Daily Traffic
- 10,000
- Material
- Concrete
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.