FUQUA ST EB over HCFCD A120-03-00
0.1 MI W OF BEAMER · County 201, Texas · Built 1980 · 2 Lanes · 8,115 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.611267, -95.2303
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 46 years old.
Nearby Bridges
FUQUA ST WB over HCFCD Unit A120-03-00
Built 1965
SEAFORD DR over HCFCD Unit A120-03-00
Built 1965
KIRKMEADOW RD over HCFCD Unit A120-03-00
Built 2019
BW 8 ML over BEAMER RD
Built 1997
BW 8 WBFR over HCFCD DITCH A-120-00-00
Built 1993
BW 8 ML over HCFCD DITCH A-120-00-00
Built 1997
BW 8 EBFR over HCFCD DITCH A-120-00-00
Built 1993
KIRKFAIR DR over HCFCD Unit A120-00-00
Built 1975
FUQUA RD EB over HCFCD Unit A120-00-00
Built 1984
FUQUA RD WB over HCFCD Unit A120-00-00
Built 1986
Bridge Details
- Structure #
- 121020B25897644
- Year Built
- 1980
- Length
- 17.7 m (58.1 ft)
- Max Span
- 17.1 m
- Width
- 10.3 m (33.8 ft)
- Lanes
- 2
- Daily Traffic
- 8,115
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,000
- Total Project Cost
- $4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.