DURHAM ST over WHITE OAK BAYOU
0.40 MI N OF IH 10 · County 201, Texas · Built 1963 · 3 Lanes · 15,030 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.781417, -95.410822
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 63 years old.
Nearby Bridges
N SHEPHERD DR over WHITE OAK BAYOU
Built 1929
N SHEPHERD DR over ABANDONED RR
Built 1988
N DURHAM DR over IH 10
Built 1967
N SHEPHERD DR over IH 10
Built 1967
PATTERSON ST over IH 10
Built 1967
TC JESTER BLVD SB over EUREKA YARD
Built 1980
TC JESTER BLVD NB over EUREKA YARD
Built 1980
TC JESTER BLVD NB over WHITE OAK BAYOU
Built 1980
T C JESTER BLVD over IH 10
Built 1967
TC JESTER BLVD SB over WHITE OAK BAYOU
Built 1980
Bridge Details
- Structure #
- 121020B20937001
- Year Built
- 1963
- Length
- 443.8 m (1456 ft)
- Max Span
- 25 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 3
- Daily Traffic
- 15,030
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $105,000
- Total Project Cost
- $131,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.