CAPITOL AVE over PARKING GARAGE ENTRANCE

0.15 MI SE OF BAGBY ST · County 201, Texas · Built 1980 · 4 Lanes · 10,659 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
121020B12209002
Year Built
1980
Reconstructed
2014
Length
12.8 m (42 ft)
Max Span
12.5 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
10,659
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.