CROSBY LYNCHBURG over HCFCD DITCH

1.30 MI S OF US 90 · County 201, Texas · Built 1990 · 4 Lanes · 10,657 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020AA9962001
Year Built
1990
Reconstructed
2023
Length
24.4 m (80.1 ft)
Max Span
7.9 m
Width
25.9 m (85 ft)
Lanes
4
Daily Traffic
10,657
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$4,000
Total Project Cost
$5,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.