DIAMONDHEAD BLVD over GUM GULLY
1.3 MI W OF FM 2100 · County 201, Texas · Built 1970 · 2 Lanes · 6,584 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.910883, -95.090442
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 56 years old.
Nearby Bridges
GOLF CLUB DR over HCFCD DITCH
Built 1978
WHERRY DR over HCFCD DITCH
Built 1977
PORT OF CALL ST over HCFCD DITCH
Built 1975
JACKSON BAYOU RD over JACKSON BAYOU
Built 1981
FM 2100 over UP RAILROAD STREETS
Built 2013
FM 2100 FR over HARRIS BRANCH (JACKSON B
Built 2012
HARBOR MIST DR over HCFCD DITCH
Built 1975
FM 2100 FR over JACKSON BAYOU
Built 2012
PECAN ST over HCFCD DITCH
Built 1988
RUNNEBURG RD. over HCFCD DITCH
Built 1992
Bridge Details
- Structure #
- 121020AA6020001
- Year Built
- 1970
- Length
- 60.4 m (198.2 ft)
- Max Span
- 20.1 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 6,584
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $10,000
- Total Project Cost
- $13,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.