E HARDY RD over HCFCD DITCH
1.1 MI S OF FM 525 · County 201, Texas · Built 1987 · 2 Lanes · 11,065 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.916625, -95.375703
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 39 years old.
Nearby Bridges
HARDY TOLL RD NB over HCFCD DITCH
Built 1987
W HARDY RD over HCFCD DITCH
Built 1978
HARDY TOLL RD SB over UPRR & HCFCD DITCH
Built 1987
LUTHE RD over HCFCD DITCH
Built 1980
HENRY RD over HCFCD DITCH
Built 1979
REEVESTON RD over HCFCD DITCH
Built 1983
SELLERS RD over HCFCD DITCH
Built 1979
CHRISMAN RD over HCFCD DITCH
Built 1987
LILLJA RD over HCFCD DITCH
Built 1978
W HARDY RD SB over N APPR TO ALDINE MAIL RT
Built 1987
Bridge Details
- Structure #
- 121020AA5775037
- Year Built
- 1987
- Length
- 14 m (45.9 ft)
- Max Span
- 14 m
- Width
- 10 m (32.8 ft)
- Lanes
- 2
- Daily Traffic
- 11,065
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.