WOODFOREST BLVD WB over HCFCD DITCH
0.40 MI W OF SHELDON RD · County 201, Texas · Built 1982 · 2 Lanes · 4,673 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
29.790611, -95.158981
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 44 years old.
Nearby Bridges
WOODFOREST BLVD EB over CARPENTERS BYU
Built 1982
BW 8 over WOODFOREST BLVD
Built 1994
BW 8 NB FR over HCFCD DITCH N-110-00-00
Built 1988
BW 8 over HCFCD DITCH N-110-00-00
Built 1994
BW 8 SB FR over HCFCD DITCH N-110-00-00
Built 1988
BW 8 over HCFCD DITCH N-111-00-00
Built 1994
BW 8 NB FR over HCFCD DITCH N-111-00-00
Built 1988
BW 8 SB FR over HCFCD DITCH N-111-00-00
Built 1988
BLACK ROCK RD over HCFCD DITCH
Built 1980
S SILVER GREEN DR over CARPENTERS BAYOU
Built 1970
Bridge Details
- Structure #
- 121020AA4689004
- Year Built
- 1982
- Length
- 15.9 m (52.2 ft)
- Max Span
- 15.9 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 4,673
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,000
- Total Project Cost
- $3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.