BAY AREA BLVD EB over HCFCD DITCH
0.9 MI W OF RED BLUFF RD. · County 201, Texas · Built 1968 · 2 Lanes · 5,470 vehicles/day
Overall
Deck
8
Very Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
29.597583, -95.084481
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 58 years old.
Nearby Bridges
BAY AREA BLVD EB over ARMAND BAYOU
Built 1968
BAY AREA BLVD WB over ARMAND BAYOU
Built 1968
RED BLUFF RD SB over BIG ISLAND SLOUGH
Built 2021
RED BLUFF RD NB over BIG ISLAND SLOUGH
Built 2021
MIDDLEBROOK DR over HORSEPEN BAYOU
Built 1988
RED BLUFF RD NB over DRAIN
Built 1967
BAY AREA BLVD EB over HORSEPEN BAYOU
Built 1968
BAY AREA BLVD WB over HORSEPEN BAYOU
Built 1968
UNIVERSITY DR over HORSEPEN BAYOU
Built 1974
RED BLUFF RD SB over SPRING GULLY
Built 1967
Bridge Details
- Structure #
- 121020AA3166005
- Year Built
- 1968
- Reconstructed
- 1985
- Length
- 26.2 m (86 ft)
- Max Span
- 8.5 m
- Width
- 10.4 m (34.1 ft)
- Lanes
- 2
- Daily Traffic
- 5,470
- Material
- Prestressed Concrete
- Design
- Other
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $41,000
- Total Project Cost
- $51,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.