SPENCER HWY over ARMAND BAYOU

0.40 MI W OF RED BLUFF RD · County 201, Texas · Built 1993 · 7 Lanes · 26,940 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
121020AA2961004
Year Built
1993
Length
25 m (82 ft)
Max Span
8.2 m
Width
29.3 m (96.1 ft)
Lanes
7
Daily Traffic
26,940
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$134,000
Total Project Cost
$168,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.