WEST RAYFORD RD over DRAINAGE DITCH
0.5 MI NW OF GOSLING RD · County 201, Texas · Built 2004 · 4 Lanes · 2,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
30.128136, -95.513878
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 22 years old.
Nearby Bridges
NORTHCREST DR over WILLOW CREEK
Built 1988
W Rayford Rd over HCFCD Ditch M104-00-00
Built 2008
GOSLING RD over WILLOW CREEK
Built 1997
Gosling Rd SB over Spring Creek
Built 2022
GOSLING RD NB over SPRING CREEK
Built 2002
LAKE PALOMA TRAIL over DRAINAGE DITCH
Built 2009
W MOSSY OAKS DR over DRAW
Built 2013
WEST RAYFORD RD over METZLER GULLY
Built 2005
WILLOWICK DR over METZLER GULLY
Built 1990
SAWDUST RD over PANTHER BRANCH
Built 1989
Bridge Details
- Structure #
- 121020AA0762002
- Year Built
- 2004
- Length
- 7 m (23 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 2,000
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.