KUYKENDAHL RD NB over SPRING CREEK
7.70 MI N OF FM 2920 · County 201, Texas · Built 1985 · 2 Lanes · 6,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.170322, -95.541367
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 41 years old.
Nearby Bridges
KUYKENDAHL RD SB over SPRING CREEK
Built 2017
FLINTRIDGE DR over DRAINAGE DITCH
Built 1999
FLINTRIDGE DR over DRAINAGE DITCH
Built 1999
FLINTRIDGE DR over DRAINAGE DITCH
Built 1999
WOODLANDS PKWY over DRAINAGE DITCH
Built 2000
WOODLANDS PKWY over SPRING CREEK TRIBUTARY
Built 2000
WOODLANDS PKWY over SPRING CREEK TRIBUTARY
Built 2000
FLINTRIDGE DR over DRAINAGE DITCH
Built 2004
PALMER WOODS DR over PALMER LAKE
Built 1992
HOLLYMEAD DR over DRAW
Built 1991
Bridge Details
- Structure #
- 121020AA0681004
- Year Built
- 1985
- Length
- 342 m (1122 ft)
- Max Span
- 36.6 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 6,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $54,000
- Total Project Cost
- $68,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.