SPENCER HWY over BIG ISLAND SLOUGH

0.5 MI E OF UNDERWOOD RD · County 201, Texas · Built 1992 · 7 Lanes · 45,486 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020AA0593004
Year Built
1992
Length
31.1 m (102 ft)
Max Span
10.1 m
Width
29.3 m (96.1 ft)
Lanes
7
Daily Traffic
45,486
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$209,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.