Elyson Falls Dr over Detention Basin
0.6 Mi NW of Peek Rd · County 201, Texas · Built 2018 · 2 Lanes · 1,000 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
29.871369, -95.78245
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 8 years old.
Nearby Bridges
FM 529(Freeman Rd) over Drainage Ditch
Built 2019
FM 529 over BEAR CREEK
Built 1968
Elyson Falls Dr over Bear Creek
Built 2021
LONGENBAUGH RD over BEAR CREEK
Built 2011
PEEK RD over S MAYDE CR
Built 1990
STOCKDICK SCHL RD over BEAR CR
Built 1989
SH 99 SB ON-RAMP over Bear Creek
Built 2013
SH 99 SB over BEAR CREEK
Built 2013
SH 99 SBML over FM 529
Built 2014
SH 99 NBOFF-RP over BEAR CREEK
Built 2013
Bridge Details
- Structure #
- 121020A19167019
- Year Built
- 2018
- Length
- 42.4 m (139.1 ft)
- Max Span
- 3 m
- Width
- 17.8 m (58.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,000
- Material
- Concrete
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.