BW 8 SB / IH 10 WB over BW 8 SBFR

4.90 MILES E OF SH 6 · County 201, Texas · Built 2007 · 1 Lanes · 22,192 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020325601403
Year Built
2007
Length
1449.4 m (4755.2 ft)
Max Span
93 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
22,192
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$356,000
Total Project Cost
$445,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.