FM 528 over FUTURE DRAINAGE CHANNEL

1.00 MI W OF IH 45 · County 201, Texas · Built 1996 · 7 Lanes · 31,638 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
121020098101022
Year Built
1996
Length
16.2 m (53.1 ft)
Max Span
3.4 m
Width
36.6 m (120.1 ft)
Lanes
7
Daily Traffic
31,638
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.