SH 288 Toll Lanes over Clear Creek

0.79 Mi S of SamHoustonTL · County 201, Texas · Built 2020 · 4 Lanes · 23,755 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
121020059801486
Year Built
2020
Length
59 m (193.6 ft)
Max Span
24.4 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
23,755
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.