SH288SBT to SHT EB over SH 288 TL & SHT WB/EB

0.90 Mi S of Almeda Genoa · County 201, Texas · Built 2020 · 1 Lanes · 5,397 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
121020059801482
Year Built
2020
Length
679 m (2227.7 ft)
Max Span
88.7 m
Width
8.7 m (28.5 ft)
Lanes
1
Daily Traffic
5,397
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.