US 59 NB over BUFFALO BAYOU IH10 andRR

US59 AT IH 10 · County 201, Texas · Built 2002 · 3 Lanes · 100,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
121020050801281
Year Built
2002
Length
1127.5 m (3699.1 ft)
Max Span
85.3 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
100,000
Material
Steel Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.