SH 225 over BOGGY BAYOU

0.5 MI E OF BELTWAY 8 · County 201, Texas · Built 1963 · 12 Lanes · 90,072 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
121020050201015
Year Built
1963
Reconstructed
1990
Length
6.7 m (22 ft)
Max Span
3 m
Lanes
12
Daily Traffic
90,072
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.