IH 45 NB FR over BERRY CREEK
0.15 MI SE OF SH 3/MONROE · County 201, Texas · Built 1989 · 2 Lanes · 27,470 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
29.667189, -95.260872
This bridge is in worse condition than 14% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 37 years old.
Nearby Bridges
IH 45 NB & HOV over BERRY CREEK
Built 1991
IH 45 SB over BERRY CREEK
Built 1991
IH 45 SB FR over BERRY CREEK
Built 1990
IH 45 NB & HOV over SH 3 (MONROE RD)
Built 1991
IH 45 SB over SH 3 (MONROE RD)
Built 1991
SH 3 EB over BERRY GULLY
Built 1964
SH 3 WB over BERRY GULLY
Built 1964
IH 45 HOV RAMP over BERRY CREEK
Built 1996
IH 45 HOV over IH 45 ML
Built 1996
IH 45 HOV RAMP over IH 45 SB FR
Built 1996
Bridge Details
- Structure #
- 121020050003285
- Year Built
- 1989
- Length
- 34.7 m (113.8 ft)
- Max Span
- 11.3 m
- Width
- 9.9 m (32.5 ft)
- Lanes
- 2
- Daily Traffic
- 27,470
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.