IH 45 SB COLL over BUFFALO BYU M ISC STR

0.10 MI N OF DALLAS ST · County 201, Texas · Built 1962 · 2 Lanes · 42,567 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
121020050003211
Year Built
1962
Reconstructed
2016
Length
587.5 m (1927.5 ft)
Max Span
34.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
42,567
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$108,000
Total Project Cost
$135,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.