SH 146 SBFR over HCFCD DRAINAGE DITCH

0.5 MI S OF SH 225 · County 201, Texas · Built 1998 · 2 Lanes · 2,572 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
121020038912281
Year Built
1998
Length
19.8 m (65 ft)
Max Span
19.2 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
2,572
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$4,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.