IH 45 SB over IH 10 EB UPRR BUFF BYU
FROM IH 10 TO ALLEN PKWY · County 201, Texas · Built 1962 · 3 Lanes · 109,825 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.772475, -95.366797
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 64 years old.
Nearby Bridges
IH 45 NB over IH 10 UPRR BUF BYU TC
Built 1962
HOGAN CROCKETT ST over IH 10 IH45 AND W OAK BYU
Built 1961
IH 45 NB over White Oak Bayou
Built 2016
IH 10 EB/IH 45 NB over WHITE OAK BYU & IH 10 WB
Built 1968
IH 45 NB/IH 10 EB over IH 10 EXIT AND ENT RAMPS
Built 1966
IH 10 WB/IH 45 SB over IH 10 EB & IH45
Built 1967
IH45SB HOV TO 10WB over RIGHT OF WAY
Built 1985
IH 10 WB over MKT RR (REMOVED)
Built 1968
IH 45 SB over WHITE OAK BYU & IH10 WB
Built 1961
IH 10 EB over MKT RR (REMOVED)
Built 1968
Bridge Details
- Structure #
- 121020027107424
- Year Built
- 1962
- Reconstructed
- 2000
- Length
- 1648.4 m (5408.1 ft)
- Max Span
- 42.7 m
- Width
- 13 m (42.7 ft)
- Lanes
- 3
- Daily Traffic
- 109,825
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $437,000
- Total Project Cost
- $546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.