IH 45 SB over IH 10 EB UPRR BUFF BYU

FROM IH 10 TO ALLEN PKWY · County 201, Texas · Built 1962 · 3 Lanes · 109,825 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
121020027107424
Year Built
1962
Reconstructed
2000
Length
1648.4 m (5408.1 ft)
Max Span
42.7 m
Width
13 m (42.7 ft)
Lanes
3
Daily Traffic
109,825
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$437,000
Total Project Cost
$546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.