IH45 SB MILAM EXIT over LOUISIANA ST ENT RAMP G
.2MI N LOUISIANA&FRANKLIN · County 201, Texas · Built 1968 · 2 Lanes · 116,060 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.764575, -95.362731
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 58 years old.
Nearby Bridges
FRANKLIN ST over BUFFALO BAYOU
Built 1914
FRANKLIN ST over BUFFALO BAYOU
Built 1931
SMITH ST CONN over BUFFALO BAYOU
Built 1962
CONGRESS AVE over SW BANK OF BUFFALO BAYOU
Built 2010
CONGRESS AVE over BUFFALO BAYOU
Built 1925
MILAM STREET over BUFFALO BAYOU
Built 1947
TRAVIS ST over BUFFALO BAYOU
Built 1972
PRESTON AVE over BUFFALO BAYOU
Built 1998
MAIN STREET over BUFFALO & WHITE OAK BYU
Built 1914
IH 10 EB over LOUISIANA ST ENT RAMP G
Built 1972
Bridge Details
- Structure #
- 121020027107318
- Year Built
- 1968
- Length
- 77.1 m (253 ft)
- Max Span
- 28 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 116,060
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $16,000
- Total Project Cost
- $20,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.