US 59 SB over GREENS RD

0.86 MI N OF BWY 8 · County 201, Texas · Built 1997 · 5 Lanes · 87,370 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020017707202
Year Built
1997
Length
114 m (374 ft)
Max Span
40.8 m
Width
30 m (98.4 ft)
Lanes
5
Daily Traffic
87,370
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.