US 59 HOV over SAN JACINTO RVR & US 59
1.7 MI N OF FM 1960 · County 201, Texas · Built 2002 · 2 Lanes · 26,153 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.024572, -95.259578
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 24 years old.
Nearby Bridges
IH 69 NBML over SAN JACINTO RIVER
Built 1974
US 59 SBML over SAN JACINTO RIVER
Built 1961
US 59 NB ON-RP over US 59 NB OFF-RP & SJ REL
Built 2002
US 59 NBFR over SAN JACINTO RIVER
Built 2000
US 59 SBFR over SAN JACINTO RIVER
Built 1999
US 59 SB ON-RP over US 59 SB OFF-RP & SJ REL
Built 2002
US 59 NB OFF-RP over SAN JACINTO RI REL
Built 2002
US 59 NBML & HOV over SAN JACINTO RI REL
Built 2002
US 59 SBML over SAN JACINTO RI REL
Built 2002
US 59 SBFR over SAN JACINTO RELIEF
Built 2000
Bridge Details
- Structure #
- 121020017706231
- Year Built
- 2002
- Length
- 849.2 m (2786.1 ft)
- Max Span
- 36.6 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 26,153
- Material
- Steel Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.