US 59 HOV RAMP over US 59 & HOV
0.75 MI N OF FM 1960 · County 201, Texas · Built 2003 · 2 Lanes · 9,600 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.016742, -95.263878
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 23 years old.
Nearby Bridges
TOWNSEN BLVD over US 59
Built 1996
TOWNSEN BLVD over SAN JACINTO RELIEF
Built 1983
US 59 SBFR over SAN JACINTO RELIEF
Built 2000
US 59 W CONN over SAN JACINTO RIVER RELIEF
Built 2000
US 59 SBML over SAN JACINTO RI REL
Built 2002
US 59 SB ON-RP over US 59 SB OFF-RP & SJ REL
Built 2002
US 59 NBML & HOV over SAN JACINTO RI REL
Built 2002
US 59 NBFR over SAN JACINTO RI REL
Built 1999
US 59 NB OFF-RP over SAN JACINTO RI REL
Built 2002
E TOWNSEN BLVD over UNION PACIFIC RAILROAD
Built 2000
Bridge Details
- Structure #
- 121020017706227
- Year Built
- 2003
- Length
- 359.4 m (1179.1 ft)
- Max Span
- 35.1 m
- Width
- 10.9 m (35.8 ft)
- Lanes
- 2
- Daily Traffic
- 9,600
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $68,000
- Total Project Cost
- $85,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.