IH 45 SBML over GREENS BAYOU

1.15 MI N OF BWY 8 · County 201, Texas · Built 1995 · 6 Lanes · 84,309 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
121020011006287
Year Built
1995
Length
62.5 m (205.1 ft)
Max Span
25.9 m
Width
29.4 m (96.5 ft)
Lanes
6
Daily Traffic
84,309
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.