IH 45 SB & HOV over FM 525 (ALDINE BENDER)

0.6 MI S OF BELTWAY 8 · County 201, Texas · Built 1989 · 6 Lanes · 107,585 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
121020011006112
Year Built
1989
Reconstructed
1995
Length
79.2 m (259.8 ft)
Max Span
21.3 m
Width
38.5 m (126.3 ft)
Lanes
6
Daily Traffic
107,585
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.