HARDY TOLL RD SB over IH 45
0.30 MI S MONTGOMERY C/L · County 201, Texas · Built 1988 · 2 Lanes · 181,539 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
30.106633, -95.435728
This bridge is in worse condition than 93.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 38 years old.
Nearby Bridges
IH 45 NBFR over HARDY TOLL RD NB
Built 1988
SPRING CROSSING RD over IH 45
Built 1991
SPRING CROSSING over HARDY TOLL RD (NB)
Built 1988
HARDY TOLL RD over HCFCD DRAINAGE DITCH
Built 1990
IH 45 SBML over SPRING CR
Built 1990
IH 45 SBFR over SPRING CR
Built 1990
IH 45 NBFR over SPRING CR
Built 1990
IH 45 NBML over SPRING CR
Built 1990
NORTHGATE CROSSING over HARDY TOLL RD
Built 1988
NORTHGATE XING SB over HCFCD DITCH
Built 1991
Bridge Details
- Structure #
- 121020011005130
- Year Built
- 1988
- Length
- 559.9 m (1836.9 ft)
- Max Span
- 64.6 m
- Width
- 11.1 m (36.4 ft)
- Lanes
- 2
- Daily Traffic
- 181,539
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.