US 90 EB over DRAINAGE DITCH

0.45 MI NE OF LORD ST · County 201, Texas · Built 1991 · 2 Lanes · 10,689 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
121020002802216
Year Built
1991
Length
17.4 m (57.1 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
10,689
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.