EDLOE ST over IH 69 / US 59
3.0 MI E OF IH 610 · County 201, Texas · Built 1975 · 7 Lanes · 20,369 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.729311, -95.433442
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 51 years old.
Nearby Bridges
IH 69 HOV E RAMP over IH 69 / US 59 HOV
Built 2000
EDLOE SB HOV RAMP over IH 69 SBML & SBFR
Built 2000
IH 69 HOV W RAMP over IH 69 / US 59 HOV
Built 2000
EDLOE NB PLAZA RP over IH 69 SBFR OFF RAMP
Built 1998
IH 69 / US 59 over BUFFALO SPEEDWAY
Built 1962
SUNSET ST over HCFCD DITCH
Built 1989
IH 69 / US 59 over WESLAYAN ST
Built 1962
RICE BLVD over HCFCD DITCH
Built 1991
IH 69 / US 59 over UP RR
Built 1962
IH 69 / US 59 over KIRBY DR
Built 1962
Bridge Details
- Structure #
- 121020002713182
- Year Built
- 1975
- Reconstructed
- 2000
- Length
- 192.4 m (631.2 ft)
- Max Span
- 27.4 m
- Width
- 28.5 m (93.5 ft)
- Lanes
- 7
- Daily Traffic
- 20,369
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $100,000
- Total Project Cost
- $125,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.