US 59 SB over MAIN ST TO ALMEDA RD
0.10 MI W OF SH 288 · County 201, Texas · Built 1975 · 3 Lanes · 91,370 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
29.732986, -95.375294
This bridge is in worse condition than 54.5% of bridges in County 201. The average bridge in Texas is 0 years old; this one is 51 years old.
Nearby Bridges
US 59 NB over MAIN ST TO ALMEDA RD
Built 1961
ALABAMA ST WB over US 59
Built 1975
ALABAMA ST EB over US 59
Built 1975
SH 288 SB over US 59 NB & ALABAMA ST
Built 1979
SH 288 SB ON-RP over US 59 SB
Built 1979
SH 288 NB CONN D over US 59 & SH 288
Built 1979
SH 288 SB over CLEBURNE ST
Built 1979
SH 288 NB CONN over ALABAMA ST
Built 1979
US 59 SB/SH 288 SB over US 59 & ALABAMA ST
Built 1979
SH 288 NB over US 59 NB & ALABAMA ST
Built 1979
Bridge Details
- Structure #
- 121020002713172
- Year Built
- 1975
- Length
- 1005.2 m (3297.9 ft)
- Max Span
- 37.5 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 3
- Daily Traffic
- 91,370
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $323,000
- Total Project Cost
- $404,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.