US 90A SB over HOLMES RD & UP RR

1.35 MI E OF S POST OAK · County 201, Texas · Built 2000 · 4 Lanes · 42,377 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
121020002709307
Year Built
2000
Length
281.9 m (924.9 ft)
Max Span
46.6 m
Width
20.2 m (66.3 ft)
Lanes
4
Daily Traffic
42,377
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.