JONES DR EB over LAKE MADELINE

1.0 MI W OF SPUR 342 · County 167, Texas · Built 1997 · 2 Lanes · 2,980 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
120850B00535001
Year Built
1997
Length
30.8 m (101 ft)
Max Span
12.2 m
Width
10.3 m (33.8 ft)
Lanes
2
Daily Traffic
2,980
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$5,000
Total Project Cost
$6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.